Wednesday, January 25, 2006

Stairs in and Garage has concrete!

shot of the stairs, which appear to covering up some usable space towards the side of the house:

back bedroom, downstairs:

happy but cold Mandy:

the tub framing is underway:

sturdy steel beam running the width of the garage:

another view of the wasted, but still usable space, potential storage area from the garage:

Roofing Started

The framing of the second floor is fairly well done and the tar paper and shingles are going on:


Got some inside shots of the fireplace and entertainment "nook":

potential for some shelves here:


kitchen (again)

living room through to the office:


Snuck upstairs and took some pics of the bonus room:

and the rec room:

Saturday, January 21, 2006

Second Floor Framing

The second floor is coming together faster than the first:



home of the pool table : )

Thursday, January 19, 2006

Construction underway

We started taking pictures a little late to include any with just the foundation, but here is the progress so far:

The foundation is in, blocked up and the first floor framing is underway.
brick selection:

Garage:



Standing in the living room looking back towards the kitchen (right) hallway and the dining room (left):

The kitchen:

Mandy at the front door: